Plan your team's work

Reserve time, check capacity and compare a reorganization before applying it.

Updated
In this guide

Understand the measures

MeasureWhat it represents
Task estimateExpected effort to complete the work.
Schedule bookingTime planned for an artist, project and period.
Declared timeDuration entered in a timesheet, with its approval state.

Measure · What it represents

Task estimate
Expected effort to complete the work.
Schedule booking
Time planned for an artist, project and period.
Declared time
Duration entered in a timesheet, with its approval state.

Read available capacity

Select the relevant period and projects in the available week, month or Gantt views. Review team bookings, absences and availability.

Contracts, working hours, public holidays and individual calendars inform capacity. Unknown capacity needs checking; it does not mean the artist is free.

Prepare a booking

  1. Choose the artist, project, optional task and dates.
  2. Enter the workload using the form options.
  3. Request a preview and check remaining capacity, absences and conflicts.
  4. Explicitly confirm the authorized proposal. If the schedule has changed, prepare a new preview.

Move and reschedule

A batch move presents affected bookings before application. Check the reason, dates and conflicts; a proposal is not an already saved change.

Dependency rescheduling proposes new dates. Completed or pinned tasks remain protected; missing or incompatible dependencies need correction.

Recurring bookings and calendars

For a recurring booking, review occurrences and exceptions before confirmation. Absence, a closed day or another booking may reduce capacity. An external commitment can occupy time without creating worked time or leave.

Compare a scenario

Prepare a proposal and verify it with the studio. Compare dates, workloads and conflicts with the current schedule before choosing what to apply.

A simulation does not reassign the team in the background. Permissions and context must still be valid at confirmation.

Suggestions stop at 500 accessible profiles; beyond that, a paginated search is required. At most 100 results are shown: refine the criteria.

Transfer to another project

Artists, dates, durations and notes follow the transfer. Tasks, nodes and already declared time stay in their original project.

  1. Select bookings and choose Transfer to a Project.
  2. Choose an accessible project and a new task, or explicitly No Task; enter a reason.
  3. Choose Check Transfer, review conflicts and confirm.
Batches and interrupted responses

A batch is limited to 100 bookings; an error prevents the entire batch from being applied. After a lost response, use Retry the Same Confirmation to recover the operation without duplication. If a colleague changed it afterward, refresh the schedule.

Available features depend on your version and installation.